Silver Electrolytic Refining Plant 30Kg Capacity

Silver Electrolytic Refining Plant 30Kg Capacity
Location:Italy
or
Call 1-800-619-GOLD
Specifications
| Year | 2025 |
| Condition | New |
| Stock Number | BT-EL-AG-030 |
| Output Capacity (24 Hours) | Up to 30Kg |
| Input Alloy Capacity | Min 12Kg Approx. (1 anode), Max 144Kg Approx. (12 anodes) |
| Type of Alloy to be Refined | Ag ≥ 80%, Au ≤ 2% |
| Yielded Purity | 999/1000 |
| Power | 2Kw |
